REGION 5 • Tommy’s Express Carwash

Our scope on this project consisted of all the concrete paving and curb involved. Concrete was chosen for the paving for this project for its durability to hold up against all the tight turns that the regular vehicular traffic will be making as well as its ability to withstand the different chemicals used through the wash itself. There were some access challenges for the ready mix trucks on this project. The lack of room made it necessary for there to be tight turns, some of which at a standstill. This type of turning, considering the weight of a loaded mixer, would have certainly torn up any first lift of asphalt should it have been used.

Accessibility Toolbar