Project Name: Spirit Airlines Parking Garage
Owner: Spirit Airlines
Project Timeline: 1 month Approximately
Completion Date: 08/23
Address: 1741 Radian Drive Dania Beach
Supplier: Supermix
Size/Area: 105,092
Sub-Contractor: Rodmark Construction
Application: Wash Slabs, Edges, Slopes
Mix: 4000 PSI PR/PM

Rodmark was pouring the Wash Slabs. This is the completion part of Tilt Ups. All the edges, borders where tilt up met. the slops for the drainage in the parking garage. Very slow pouring takes a long time.