Project Name: South Corridor Rapid Transit Project
Project Timeline: 24 Months
Completion Date: 06/2023
Address: Miami
Owner: Miami Dade County
Supplier: Cemex
Contractor: OHL
Sub-Contractor: Construct Group Corp
Mix: 4000 psi, 5500 psi
Size/Area: 20 miles
Website Links: https://www.miamidda.com/placemaking-transportation/transportation/smart-plan/6-south-corridor/

The South Corridor Rapid Transit Project is a 20-mile corridor that will connect some of the region’s fastest-growing communities along an exclusive transit right-of-way.

The South Corridor Rapid Transit Project is one of six corridors in the Strategic Miami Area Rapid Transit Plan, aiming to expand and connect premium transit services and improve transit reliability.
The bus rapid transit (BRT) corridor will parallel US-1, be equipped with signal preemption, and offer a 60-minute ride between Homestead and Downtown Miami. The corridor includes 14 new state-of-the-art stations that will serve BRT and all-stop routes and 16 additional stops for the all-stop route on the South Dade TransitWay. Every bus stop will have concrete pavement and have approx 10,000 C/Y on Pavement w/Fibers for the project.