Project Name: Link at Douglas Phase II
Project Timeline: 11 months
Completion Date: 03/15/2022
Address: Coral Gables, FL
Owner: Adler Group
Supplier: Cemex
Sub-Contractor: L&R Structural
Mix: 6000PSI
Application: High Rise Condo
Website Links: https://floridayimby.com/2021/08/two-39-story-towers-proposed-for-link-at-douglas-phase-2-near-coral-gables.html

Link at Douglas -Phase 2, a two-tower 39-story mixed-use building proposed adjacent to the Douglas Road Metrorail Station. The structure is designed by Arquitectonica and being developed between Adler Group and 13th Floor Investments, and is projected to yield over 1.1 million square feet of space including 854 residential units, 84,160 square feet of office space, 3,385 square feet of retail space and 1,166 parking spaces. The property is bounded by Douglas Road to the east, South Dixie Highway to the south and aligns with Southwest 38th Avenue on the west at the border between Miami and Coral Gables.