[et_pb_section fb_built=”1″ _builder_version=”3.22″][et_pb_row _builder_version=”3.25″ background_size=”initial” background_position=”top_left” background_repeat=”repeat” custom_padding=”||27px|||”][et_pb_column type=”4_4″ _builder_version=”3.25″ custom_padding=”|||” custom_padding__hover=”|||”][et_pb_text _builder_version=”4.9.9″ background_size=”initial” background_position=”top_left” background_repeat=”repeat”]Project Name: Krome Ave SR997 FDOT Krome Paving
Project Timeline: 5 Months
Completion Date: 09/01/2022
Address: Krome Ave, Homestead, FL
Owner: FDOT
Supplier: Cemex USA
Sub-Contractor: Construct Group Corp
Mix:  CL I Paving Mix
Application: Concrete Road Paving
Website Link: https://www.fdotmiamidade.com/design-projects/krome-avenue/sr-997krome-avenue-from-sw-136-st-to-sr-94sw-88-stkendall-dr-1/

New roadway along SR 997/Krome Avenue The new roadway will be four lanes divided with paved shoulders on both sides and will be constructed using concrete pavement
• Constructing two new bridges (one for northbound and one for southbound traffic) across the Black Creek Canal
• Adding a shared-use path on the east side of the roadway for bicyclists and pedestrians
• Installing guardrail within the median
• Installing new drainage structures
• Installing new traffic signs
• Installing lighting
• Installing traffic signals at the intersections
[/et_pb_text][/et_pb_column][/et_pb_row][et_pb_row _builder_version=”4.9.9″ _module_preset=”default”][et_pb_column type=”4_4″ _builder_version=”4.9.9″ _module_preset=”default”][et_pb_gallery gallery_ids=”14074,14073,14072,14071″ posts_number=”20″ show_title_and_caption=”off” _builder_version=”4.9.9″ _module_preset=”default”][/et_pb_gallery][/et_pb_column][/et_pb_row][/et_pb_section]