Project Name: Grove Central
Project Timeline: 2022
Completion Date: 08/2022
Address: 2780 SW 27 Terrace, Miami, FL (Coconut Grove)
Owner: Terra
Supplier: Cemex USA (Miami Readymix)
Contractor: Juneau
Sub-Contractor: RSI
Mix: 7200 PSI in 28 Days Regular Mix
Application: Readymix
Fiber: None
Website Link: https://grovecentral.com/

Grove Central is a transit-oriented mixed-use development in Miami FL, located at the intersection of US-1 and SW 27th Avenue, and has been designed to be an extension of the Coconut Grove lifestyle and vibe. The exceptional location connects residents and visitors to the area’s most desirable destinations for work, relaxation, and shopping. The project will connect to the adjacent Coconut Grove Metrorail station, and integrate directly with The Underline linear park, offering thoughtful green spaces, promote a pedestrian and bike-friendly lifestyle, and a reenergized Plaza all closely synced and populated with a lively mix of uses that will make this a popular key destination of activity and culture welcoming visitors and locals alike.