[et_pb_section fb_built=”1″ _builder_version=”4.16″ global_colors_info=”{}”][et_pb_row _builder_version=”4.16″ background_size=”initial” background_position=”top_left” background_repeat=”repeat” custom_padding=”||27px|||” global_colors_info=”{}”][et_pb_column type=”4_4″ _builder_version=”4.16″ custom_padding=”|||” global_colors_info=”{}” custom_padding__hover=”|||”][et_pb_text admin_label=”Text” _builder_version=”4.23″ background_size=”initial” background_position=”top_left” background_repeat=”repeat” custom_padding=”||0px|||” global_colors_info=”{}”]

Project Name: FPL New Canopy Central Service Center
Location: 122 SW 3 Street Miami
Project Timeline: 60 Days Approx
Completion Date: 1/1/2024
Size/Area: 950 square feet
Mix: 3000 psi
Owner: FPL
Contractor: Contierra Construction Management
Sub-contractor: N/A
Supplier: Supermix
Engineer: N/A
Application: Monolitic SOG & Footers
Fiber: N/A
Website Links: N/A

 

Open Air Canopy Main Structure Charging Center. Located inside the Central Dade yard in Downtown Miami. Challenged with a mine field of underground utilities, posed a lot of changes for excavation. Pouring times needed to be strategy coordinated with FPL to avoid blocking the exit of the FPL equipment. Washout areas for the equipment was also a challenge due to the tight area.

[/et_pb_text][/et_pb_column][/et_pb_row][et_pb_row _builder_version=”4.21.0″ _module_preset=”default” global_colors_info=”{}”][et_pb_column type=”4_4″ _builder_version=”4.21.0″ _module_preset=”default” global_colors_info=”{}”][et_pb_gallery gallery_ids=”15845,15844,15843″ show_title_and_caption=”off” _builder_version=”4.23″ _module_preset=”default” hover_enabled=”0″ global_colors_info=”{}” sticky_enabled=”0″][/et_pb_gallery][/et_pb_column][/et_pb_row][/et_pb_section]