Project Name: Vero Beach Regional Airport – Apron Reconstruction
Project Timeline: 9 Months
Completion Date: 09/2021
Address: Vero Beach, FL
Supplier: Maschmeyer Concrete
Owner: City of Vero Beach
General Contractor: Summit Construction of Vero Beach
Sub-Contractor: RF Concrete
Size: 100,000 sq ft
Mix (psi):
P501 650 PSI FLEX MIX

This project included installation of a new trench drain, the complete reconstruction of the Center Apron, and an aircraft parking area. An area of approximately 100,000 sq ft was removed and re-poured with a P501 650 psi flex mix at a depth of 14″.