Project Name: Certus Assisted Living
Project Timeline: 4 Months ( shell)
Completion Date: 11/2020
Address: Vero Beach
Supplier: Maschmeyer Concrete
Sub-Contractor: Drawdy Construction, Oceanside Masonry
Mix (psi): 3,000 PSI all mixes

This 100 room assisted living facility includes 800 yards of concrete provided by Maschmeyer Concrete. Drawdy Construction was the concrete contractor and Oceanside Masonry was the mason.