[et_pb_section fb_built=”1″ _builder_version=”3.22″][et_pb_row _builder_version=”3.25″ background_size=”initial” background_position=”top_left” background_repeat=”repeat”][et_pb_column type=”4_4″ _builder_version=”3.25″ custom_padding=”|||” custom_padding__hover=”|||”][et_pb_text _builder_version=”4.9.0″ background_size=”initial” background_position=”top_left” background_repeat=”repeat”]

Project Name: Certus Assisted Living
Project Timeline: 4 Months ( shell)
Completion Date: 11/2020
Address: Vero Beach
Supplier: Maschmeyer Concrete
Sub-Contractor: Drawdy Construction, Oceanside Masonry
Mix (psi): 3,000 PSI all mixes

This 100 room assisted living facility includes 800 yards of concrete provided by Maschmeyer Concrete. Drawdy Construction was the concrete contractor and Oceanside Masonry was the mason.

 

[/et_pb_text][/et_pb_column][/et_pb_row][et_pb_row column_structure=”1_2,1_2″ _builder_version=”4.9.0″ _module_preset=”default”][et_pb_column type=”1_2″ _builder_version=”4.9.0″ _module_preset=”default”][dsm_perspective_image src=”https://fcpa.org/wp-content/uploads/Certus-3.jpg” title_text=”Certus-3″ _builder_version=”4.9.0″ _module_preset=”default”][/dsm_perspective_image][/et_pb_column][et_pb_column type=”1_2″ _builder_version=”4.9.0″ _module_preset=”default”][dsm_perspective_image src=”https://fcpa.org/wp-content/uploads/Certus-1.jpg” title_text=”Certus-1″ _builder_version=”4.9.0″ _module_preset=”default”][/dsm_perspective_image][/et_pb_column][/et_pb_row][/et_pb_section]

Accessibility Toolbar