Project Name: Lake Manatee WTF
Project Timeline: 9/1/2022-9/21/2022
Completion Date: 9/21/2022
Address: Bradenton
Supplier: Preferred Materials
Owner: Manatee Co
Contractor: PCL
Sub-Contractor: Florida Structural Concrete LLC
Engineer: Dean Milton
Size/Area: 15k SF
Mix: 4000 PSI
Application: Paving
Fiber: Sika Fibermesh 650

Upon receipt and consideration of the DAP Amy Wedel sent over for this project the GC (PCL) decided to make the change over to concrete for this portion of paving at this water treatment facility in Manatee Co. The subcontractor (Florida Structural) feels that the placement process and end result was so good that they will consider concrete going forward on their upcoming projects for Manatee Co.