[et_pb_section fb_built=”1″ _builder_version=”3.22″][et_pb_row _builder_version=”3.25″ background_size=”initial” background_position=”top_left” background_repeat=”repeat” custom_padding=”||27px|||”][et_pb_column type=”4_4″ _builder_version=”3.25″ custom_padding=”|||” custom_padding__hover=”|||”][et_pb_text _builder_version=”4.9.9″ background_size=”initial” background_position=”top_left” background_repeat=”repeat” hover_enabled=”0″ sticky_enabled=”0″]Project Name: E911 Fire Station Backup Facility
Project Timeline: 4 Months
Completion Date: 11/22
Size / Area: 14,000 Sq ft
Address: Labelle, FL
Supplier: Cemex
Owner: Glades County BOCC
Contractor: Wright Construction
Sub-Contractor: David’s Carpentry & Masonry
Application: Slab on Grad and Paving
Mix: 3000

The $44,500 Building will be used as a Training Center and Back up Emergency Response, located on Pollywog Road. David’s Carpentry & Concrete handled the concrete portion that consisted of slab on grade and paving. The project consisted of approximately 450 yards of concrete.[/et_pb_text][/et_pb_column][/et_pb_row][et_pb_row _builder_version=”4.9.9″ _module_preset=”default”][et_pb_column type=”4_4″ _builder_version=”4.9.9″ _module_preset=”default”][et_pb_gallery gallery_ids=”14660″ posts_number=”2″ show_title_and_caption=”off” show_pagination=”off” _builder_version=”4.9.9″ _module_preset=”default”][/et_pb_gallery][/et_pb_column][/et_pb_row][/et_pb_section]

Accessibility Toolbar