CEMEX teamed up with Full Tilt Constructors and provided 15,000 yards of concrete paving. The total size of the parking lot and roads that were paved came in just over 480,000 sq ft. The job is on Major Blvd, Orlando, Florida. The paving section started in September 2017 and finished up November 2017. The concrete specs required 4,000 psi mix with 3lbs of macro fiber. Pour sizes was roughly 500-700 yards per day when placed.