[et_pb_section fb_built=”1″ _builder_version=”3.22″][et_pb_row _builder_version=”3.25″ background_size=”initial” background_position=”top_left” background_repeat=”repeat”][et_pb_column type=”4_4″ _builder_version=”3.25″ custom_padding=”|||” custom_padding__hover=”|||”][et_pb_text _builder_version=”4.8.2″ background_size=”initial” background_position=”top_left” background_repeat=”repeat” hover_enabled=”0″ sticky_enabled=”0″]Project Name: Orlando International Airport South Terminal
Project Timeline: 4 years
Completion Date: February 2022
Location: Orlando, FL
Owner: Greater Orlando Aviation Authority
Supplier: Cemex, Maschmeyer, Argos
General Contractor: Hensel Phelps / Turner-Kiewit Joint Venture
Sub-Contractor: CCK, Cornerstone Construction, T&T Construction of Central Florida
Engineer: C&S Companies
Size: 1,638,000 sf
Mix (psi): Various – 4,000 lightweight and normal weight
Application: Elevated decks, slab on grade
Fiber: FORTA Ferro macro synthetic supplied FRC Resources
When Orlando International’s new $2 billion plus South Terminal Expansion is complete, it will include a 5-level, 816,000 sq ft land-side passenger processing structure, a 822,000 sq ft air-side concourse, which consists of 19 gates, and an Automated People Mover (APM) Inter-model Terminal facility. To control unwanted cracking, FORTA Ferro macro synthetic fibers were used in all elevated slabs, the automated baggage basement floor, APM platforms, and roof decks. To stiffen the 5 1/4 inch composite metal decks, designers incorporated 5 lbs. of the macro fibers in 4,000 psi lightweight concrete to supplement 4×4-W4.0xW4.0 welded wire fabric.[/et_pb_text][dsm_perspective_image _builder_version=”4.8.2″ _module_preset=”default” hover_enabled=”0″ sticky_enabled=”0″][/dsm_perspective_image][/et_pb_column][/et_pb_row][et_pb_row _builder_version=”4.8.2″ _module_preset=”default” column_structure=”1_2,1_2″][et_pb_column _builder_version=”4.8.2″ _module_preset=”default” type=”1_2″][dsm_perspective_image _builder_version=”4.8.2″ _module_preset=”default” title_text=”IMG_5680″ src=”https://fcpa.org/wp-content/uploads/IMG_5680.jpg” hover_enabled=”0″ sticky_enabled=”0″][/dsm_perspective_image][/et_pb_column][et_pb_column _builder_version=”4.8.2″ _module_preset=”default” type=”1_2″][dsm_perspective_image _builder_version=”4.8.2″ _module_preset=”default” title_text=”PlatformDeckOIAARMComplex” src=”https://fcpa.org/wp-content/uploads/PlatformDeckOIAARMComplex.jpg” hover_enabled=”0″ sticky_enabled=”0″][/dsm_perspective_image][/et_pb_column][/et_pb_row][/et_pb_section]