Project Name: Orange Theory
Location: 4951 Seminole Pratt Whitney Rd West Lake
Project Timeline: 90 days
Completion Date: 09/15/2024
Size/Area: 3000 square feet
Mix: 3000 PSi Blendmix & 3000 PSI PR/PM
Owner: N/A
Contractor: Contierra Engineering
Sub-Contractor: N/A
Supplier: Supermix
Engineer: N/A
Application: SOG
Fiber: N/A
Website Links: N/A

A shopping center venue was turned into an Orange Theory in 90 days.  Conditions were a bit challenging for the G.C. between plumbing, electrical work then the SOG had to be pumped in from the rear door. Since location was in a shopping center Mixer could not block the entrance.  A concrete pump with extra hoses was called for assistance.  Concrete was pumped to the front of the venue .  With the finishing crew ready to start.  With everyone’s assistance the SOG looks amazing.