Project Name: Manor West River
Location: Tampa, FL
Project Timeline: 6 Months
Completion Date: 1/2024
Size/Area: 12,500 Yards
Mix: 3000,4000,5000,6000,7000
Owner: N/A
Contractor: Balfour Beaty
Sub-Contractor: BM Concrete
Supplier: Maschmeyer Concrete
Engineer: N/A
Application: N/A
Fiber: N/A
Website Links: https://balfourbeattyus.com/portfolio/project-portfolio/project-portfolio-detail/manor-west-river
Open Air Canopy Main Structure Charging Center. Located inside the Central Dade yard in Downtown Miami. Challenged with a mine field of underground utilities, posed a lot of changes for excavation. Pouring times needed to be strategy coordinated with FPL to avoid blocking the exit of the FPL equipment. Washout areas for the equipment was also a challenge due to the tight area.