Dania Pointe Mall

Project Name: Dania Pointe Mall
Location: 139 South Compass Way
Project Timeline: 2 Months
Completion Date: August 2025
Size/Area: 630 SF
Mix: 4000 PSI REGULAR MIX
Owner: N/A
Contractor: AD RESTORATION & WATERPROOFING
Sub-Contractor: N/A
Supplier: SUPERMIX CONCRETE
Engineer: N/A
Application: SIDEWALKS
Fiber: N/A
Website Links: N/A

Dania Point Mall needed sidewalk repairs for the mall. All concrete poured was 4500 PSI with Antique Cork color with broom finish.