BAE Systems Ship Lift & Land Level Ship Repair Facility

Project Name: BAE Systems Ship Lift & Land Level Ship Repair Facility
Location: 8500 Heckscher Drive, Jacksonville, FL 32226
Project Timeline: July 2023 thru December 2024
Completion Date: 12/2024
Size/Area: 10 Acres
Mix: 5000
Owner: BAE Systems
Contractor: Kiewit Infrastructure
Sub-Contractor: N/A
Supplier:Argos USA Division of Summit Materials a Quikrete Company
Engineer: Foth Engineering
Application: Self-Consolidating Concrete was used on the pier and all concrete supplied to the project included corrosion inhibitor. 25,000 Yards Total
Fiber: N/A
Website Links: https://www.baesystems.com/en/article/bae-systems-launches-250-million-state-of-the-art-shiplift-and-land-level-ship-repair-facility-in-jacksonville

The project, together with Pearlson Shiplift Corporation, Foth Engineering, and Kiewit Infrastructure South Co., replaces an 80-year-old drydock that had reached the end of its lifecycle. The state-of-the-art shiplift system’s platform spans 492 feet by 110 feet, offering a more cost-effective and efficient alternative to traditional drydocks. It will be one of the ten largest shiplift systems in the world and the largest in the Americas. The shiplift and land level repair complex will support the maintenance and repair of Mayport-based Navy vessels and commercial ships sailing into the Port of Jacksonville. With the capacity to lift ships displacing up to 25,000 tons and accommodate multiple vessels for maintenance simultaneously ashore, the new complex expands the shipyard’s capabilities threefold.