JEA Biosolids

Project Name: JEA Biosolids
Location: Jacksonville, FL
Project Timeline: 9 months
Completion Date: 12/2025
Size/Area: 12,000 CY
Mix: 4500 PSI
Owner: JEA
Contractor: Wharton Smith
Sub-Contractor: VMG Construction
Supplier: Preferred Materials
Engineer: Carollo
Application: Wastewater Treatment Building & Tanks
Fiber: No Fiber
Website Links: N/A

12,000+ CY addition to the JEA Biosolids facility on Talleyrand Ave. in Jacksonville Florida. 700CY of which are using the Xypex Bio-San admixture. This admix is specifically formulated for usage in wastewater treatment plants. The admix is used in lieu of applying a protective barrier on concrete after placement.

Accessibility Toolbar