Project Name: The District 225
Location: 225 N Miami Ave Miami, Florida
Project Timeline: Approx 1 year
Completion Date: End of April beginning of May
Size/Area: 540,000
Mix: Varies from 3000 PSI to 10,000 PSI
Owner: Related Group
Contractor: Craft Construction
Sub-Contractor: N/A
Supplier: Supermix Concrete
Engineer: N/A
Application: N/A
Fiber: N/A
Website Links: N/A
Open Air Canopy Main Structure Charging Center. Located inside the Central Dade yard in Downtown Miami. Challenged with a mine field of underground utilities, posed a lot of changes for excavation. Pouring times needed to be strategy coordinated with FPL to avoid blocking the exit of the FPL equipment. Washout areas for the equipment was also a challenge due to the tight area.