[et_pb_section fb_built=”1″ _builder_version=”4.16″ global_colors_info=”{}”][et_pb_row _builder_version=”4.16″ background_size=”initial” background_position=”top_left” background_repeat=”repeat” custom_padding=”||27px|||” global_colors_info=”{}”][et_pb_column type=”4_4″ _builder_version=”4.16″ custom_padding=”|||” global_colors_info=”{}” custom_padding__hover=”|||”][et_pb_text admin_label=”Text” _builder_version=”4.23″ background_size=”initial” background_position=”top_left” background_repeat=”repeat” custom_padding=”||0px|||” global_colors_info=”{}”]

Project Name: The District 225
Location: 225 N Miami Ave Miami, Florida
Project Timeline: Approx 1 year
Completion Date: End of April beginning of May
Size/Area: 540,000
Mix: Varies from 3000 PSI to 10,000 PSI
Owner: Related Group
Contractor: Craft Construction
Sub-contractor: N/A
Supplier: Supermix Concrete
Engineer: N/A
Application: N/A
Fiber: N/A
Website Links: N/A

 

Open Air Canopy Main Structure Charging Center. Located inside the Central Dade yard in Downtown Miami. Challenged with a mine field of underground utilities, posed a lot of changes for excavation. Pouring times needed to be strategy coordinated with FPL to avoid blocking the exit of the FPL equipment. Washout areas for the equipment was also a challenge due to the tight area.

[/et_pb_text][/et_pb_column][/et_pb_row][et_pb_row _builder_version=”4.21.0″ _module_preset=”default” global_colors_info=”{}”][et_pb_column type=”4_4″ _builder_version=”4.21.0″ _module_preset=”default” global_colors_info=”{}”][et_pb_gallery gallery_ids=”15967,15968″ show_title_and_caption=”off” _builder_version=”4.23″ _module_preset=”default” hover_enabled=”0″ global_colors_info=”{}” sticky_enabled=”0″][/et_pb_gallery][/et_pb_column][/et_pb_row][/et_pb_section]