[et_pb_section fb_built=”1″ _builder_version=”4.16″ global_colors_info=”{}”][et_pb_row _builder_version=”4.16″ background_size=”initial” background_position=”top_left” background_repeat=”repeat” custom_padding=”||27px|||” global_colors_info=”{}”][et_pb_column type=”4_4″ _builder_version=”4.16″ custom_padding=”|||” global_colors_info=”{}” custom_padding__hover=”|||”][et_pb_text _builder_version=”4.21.0″ background_size=”initial” background_position=”top_left” background_repeat=”repeat” global_colors_info=”{}”]

Project Name: Centennial Village – University of Miami
Project Timeline: 8
Completion Date: 06/23
Address: 1231 Dickinson Drive, Coral Gables
Size / Area: 522,000 sf
Owner: University of Miami
Contractor: Coastal Construction
Sub-Contractor: Reinforced Structures Inc.
Mix: 3500 psi to 8000 psi

This project was put on hold during the Covid-19 pandemic. Now it restarted even stronger. Originally was a 4 residential colleges officering housing for 1,700 student plan now it calls for a fifth residential college, bring the estimated occupancy to approximately 2,025 students.

[/et_pb_text][/et_pb_column][/et_pb_row][et_pb_row _builder_version=”4.16″ _module_preset=”default” global_colors_info=”{}”][et_pb_column type=”4_4″ _builder_version=”4.16″ _module_preset=”default” global_colors_info=”{}”][et_pb_gallery gallery_ids=”14987″ posts_number=”5″ show_title_and_caption=”off” show_pagination=”off” _builder_version=”4.21.0″ _module_preset=”default” global_colors_info=”{}”][/et_pb_gallery][/et_pb_column][/et_pb_row][/et_pb_section]

Accessibility Toolbar