[et_pb_section fb_built=”1″ _builder_version=”3.22″][et_pb_row _builder_version=”3.25″ background_size=”initial” background_position=”top_left” background_repeat=”repeat”][et_pb_column type=”4_4″ _builder_version=”3.25″ custom_padding=”|||” custom_padding__hover=”|||”][et_pb_text _builder_version=”4.8.1″ background_size=”initial” background_position=”top_left” background_repeat=”repeat” hover_enabled=”0″ sticky_enabled=”0″]
Project Name: MM Grade School
Project Timeline: 20 months
Completion Date: 8/2021
Address: Nocatee, FL
Supplier: Cemex
General Contractor: STG Contracting Group
Sub-Contractor: Structural Construction of Orlando
Owner: St. Johns County School Board
Size: 14,000 yards
Mix (psi): 4,000 psi
MM Grade School is a K-8 School located in Nocatee FL in the Northwest part of St. Johns County. It is a concrete tilt-up project and the concrete work was performed by Structural Construction of Orlando. Concrete work was completed in January of 2021.